|
|
|
|
To protect your pavement investment while ensuring a safe and attractive lot, cracks must be sealed as they develop. The freeze/thaw cycles of our winters allow moisture to penetrate under the asphalt forming ice. This process allows deterioration to begin and potholes to form. We use hot rubberized crack sealant that remains flexible, keeping cracks sealed as the pavement expands in summer and contracts in winter. It will not pick up or "track" due to the high melting point of the materials. Hot rubberized crack repair is slightly higher in cost yet it is a vital part of the sealing process. Cracks which have been repaired with hot rubber sealants are ready for traffic in less than 20 minutes. Specify that your cracks only be repaired using a hot rubberized crack
sealing process to prevent water and ice from accelerating the damage to your
asphalt investment.
|
|
Copyright ©2003-2008 B and E Coatings. All rights reserved. |